Search
Close this search box.

Inchture Primary School

WORK CARRIED OUT: The Inchture Primary School project has been successfully completed, and it adheres to the BSEN12845 standards, specifically following OH1 fire protection guidelines. This project focused on ensuring fire safety for a public school (PS), with fire protection measures that included external water supplies and an internal pump house. The completion of this […]

Norbord Inverness

WORK CARRIED OUT: The completed project at Norbord in Inverness is in accordance with the BSEN12845 standards, specifically following OH3 fire protection guidelines. This project focused on ensuring fire safety for sheds and utilized existing water supplies as part of the fire protection measures. The successful completion of this project signifies the commitment to safeguarding […]

Green Market Dundee

The ongoing Green Market project in Dundee is dedicated to adhering to rigorous fire protection and safety standards, specifically following the BS9251:2021 guidelines. Categorized as Category 3, this project is focused on student accommodation. To ensure effective fire protection, the system includes an internal storage tank paired with a vertical fire pump set. Full monitoring […]