Search
Close this search box.

Inchture Primary School

WORK CARRIED OUT: The Inchture Primary School project has been successfully completed, and it adheres to the BSEN12845 standards, specifically following OH1 fire protection guidelines. This project focused on ensuring fire safety for a public school (PS), with fire protection measures that included external water supplies and an internal pump house. The completion of this […]

Bervie Road Fraserburgh

WORK CARRIED OUT: The project at Bervie Road in Fraserburgh has been successfully completed and adheres to the BS9251:2021 standards for fire protection. This project pertained to a Category 2 fire sprinkler system installation within a single block comprising 6 flats. An external pump house was incorporated into the system to ensure its efficiency and […]

Royal Gardens Stirling

Royal Gardens Stirling

WORK CARRIED OUT: The Royal Gardens project in Stirling has been successfully completed, fully compliant with the BS9251:2021 standards for fire protection. This project focused on the installation of a Category 1 fire sprinkler system within a single dwelling. To ensure efficient fire protection, the system includes an internal storage tank and a dedicated fire […]

Former Water Works – Montrose

WORK CARRIED OUT: The completed project at the former water works in Montrose adheres to the BS9251:2014 standards for fire protection. This project involved the installation of a fire sprinkler system within a single dwelling, categorized under an appropriate category (please specify the category number). The system is equipped with an internal storage tank and […]

Former Hilton Hotel Aberdeen

WORK CARRIED OUT: The former Hilton Hotel project in Aberdeen, which involved alteration works, has been successfully completed, and it adheres to the BSEN12845 standards for fire protection. Specifically, this project focused on OH1 fire protection standards, ensuring the safety and compliance of the building. The facility now serves as student accommodation, where these fire […]

Derby Street Dundee

Derby Street Dundee

WORK CARRIED OUT: The Derby Street project in Dundee has been completed, fully complying with the BS9251:2014 standards for fire protection. This comprehensive endeavour encompassed a Category 2 fire sprinkler system installation, catering to a combination of single dwellings and blocks of flats. The fire protection system featured two internal storage tanks along with corresponding […]

Findtrack House Aberdeenshire

Findtrack House Aberdeenshire

WORK CARRIED OUT: The Findtrack House project in Aberdeenshire has been completed, demonstrating strict adherence to the BS9251:2014 standards for fire protection. This project centred around the installation of a Category 1 fire sprinkler system within a single dwelling. The system included an internal storage tank and a dedicated fire pump set to ensure effective […]

Justice Mill Studios Aberdeen

Justice mill studios Aberdeen

WORK CARRIED OUT: The Justice Mill Studios project in Aberdeen has reached successful completion, showcasing its adherence to the BS9251:2021 standards for fire protection. This project focused on implementing a Category 4 fire sprinkler system within student accommodation. The system incorporated an internal storage tank and duty standby pump sets to ensure robust firefighting capabilities. […]

Fairfield Housing Project Perth

The Fairfield Housing Project in Perth marks a completed venture that adheres to the BS9251:2021 standards for fire protection. This project focused on a Category 2 fire sprinkler system installation within two blocks of flats. To ensure a swift and efficient response to fire emergencies, the system was connected to the town’s main water supply, […]

10 North Silver Street Aberdeen

10 North silver street Aberdeen

WORK CARRIED OUT: The project at 10 North Silver Street in Aberdeen has been completed, demonstrating adherence to the BS9251:2021 standards for fire protection. This project pertained to a Category 1 fire sprinkler system installation within a single flat. The system includes an internal storage tank and a dedicated fire pump, ensuring efficient fire protection […]