225 Bath Street – Glasgow

bath st glasgow
Project Specification:
OUR CLIENT : Stothers M&E
MAIN CONTRACTOR : Graham Group
LOCATION : Glasgow
PROJECT SIZE : 551 Bed PBSA
Design & Install Criteria:
  • BSEN12845
  • OH1 – 35m
  • TB202
  • 100,000 Litre storage tank
  • Diesel Electric pump set
  • Level 0 & Half of Level 1 – Commercial
  • Level 1 – level 11 – Residential
  • 3 commercial ICVs
  • 11 residential ICVs
  • Full monitoring
  • 3005 sprinkler heads
  • 1 Dry Riser
Key Details

A new student accommodation complex ‘iQ Cullen House’ at 225 Bath Street Glasgow city centre is being developed by contractor GRAHAM and designed by architects Cooper Cromar, replacing a demolished 1970s office block. The 12-storey building will feature 551 bedrooms and is set to be completed by 2025. The PBSA will include luxury communal amenities such as a gym, gaming arcade, dining spaces, and social areas. Located next to Elgin Place, another GRAHAM-built student accommodation with 323 beds, the new development will feature a glazed frontage and offer a range of living options for students.